+7 717 264 08 69
Artesis e-PCM Application Navigator: Pick Your Asset, Read the Right Guide
Мақала2026 ж. 30 маусым

Artesis e-PCM Application Navigator: Pick Your Asset, Read the Right Guide

Hydro, steam, gas, wind, diesel — one e-PCM technology, five scenarios. Decision table, BOP with e-MCM, and links to sector guides.

Мақала орыс тілінде

Мақаланың толық мәтіні қазіргі уақытта орыс тілінде жарияланған. Аударма дайындалуда — толық мәтін үшін орыс нұсқасына өтіңіз.

Орыс тілінде оқу

Artesis e-PCM application navigator

Artesis e-PCM monitors the generator and prime mover from generator output signals. One product covers five common deployment patterns — this page helps you pick the right guide.

Quick picker

Your asset Product Deep dive
Hydro unit, steam turbine e-PCM Hydro & steam
Gas turbine (CCGT, cogeneration) e-PCM Gas turbines
Wind turbine e-PCM Wind farms
Diesel genset (backup) e-PCM DGS backup power
Pumps, fans, conveyors (BOP) e-MCM Industry map
Route survey AMT Pro AMT Pro route
Multi-site fleet Artesis IoT Fleet centralisation

One tech — different pain points

Scenario Main pain Why e-PCM
Hydro / steam Block outage Generator electrical + low-speed drive
Gas Remote sites, refineries Retrofit without full CMS
Wind Nacelle visits Tower-base install
DGS Failed start on grid loss Trend every test run

Station stack

Turbo-generator / DGS / WTG → e-PCM
BOP motors → e-MCM
Route fleet → AMT Pro
Artesis IoT / DCS

e-PCM vs vibration

Case Recommendation
High-speed GT/ST with CMS Bently on shaft + e-PCM on generator
Small hydro, no CMS e-PCM as primary online channel
Wind, costly nacelle access e-PCM first
Critical DGS e-PCM per unit
Motors only (no generator) e-MCM, not e-PCM

Getting started

  1. Pilot e-PCM on one critical turbo-generator or DGS.
  2. Pilot e-MCM on 3–5 BOP drives — 90-day plan.

All e-PCM guides

  1. Hydro & steam
  2. Gas turbines
  3. Wind farms
  4. Diesel gensets

Broader map: Artesis by industry.

KEG TRK — official Artesis distributor. e-PCM catalog · Contact