+7 717 264 08 69
Artesis e-PCM for Gas Turbines: GTG Monitoring for Power and Oil & Gas
Применение30 июня 2026 г.

Artesis e-PCM for Gas Turbines: GTG Monitoring for Power and Oil & Gas

CCGT, cogeneration and remote oil & gas sites: how e-PCM monitors the gas turbine and generator from generator output — bearings, misalignment, windings without shaft sensors.

Artesis e-PCM gas turbine monitoring

A gas turbine drives CCGT blocks, cogeneration and autonomous power at oil & gas sites. Bearing failure, misalignment or generator winding damage stops generation and process heat — GT overhauls mean weeks of downtime.

Many sites already run Bently Nevada CMS, but generator electrical faults and remote units without full CMS remain gaps.

Artesis e-PCM reads generator output current and voltage to detect turbine, coupling and gearbox mechanical issues plus winding degradation — panel install only, no GT shaft sensors.

Where it applies

Segment Unit Goal
CCGT / power 20–400 MW GTG Block availability
Cogeneration Refinery / metals CHP Continuous output
Oil & gas Field GT sets, compressor stations Remote monitoring
Peaking / reserve GT on thermal plant Fewer forced trips

Industry map · e-PCM navigator

What e-PCM monitors

Gas turbine

Rotor imbalance, GT–coupling–generator misalignment, bearing wear, looseness, reduction-gear issues.

Generator

Winding degradation, eccentricity, phase unbalance, harmonics, excitation clues.

GT auxiliaries

Lube/fuel pumps, cooling fans → e-MCM at MCC.

e-PCM vs vibration

CMS/Bently e-PCM
High-speed GT Industry standard Complement
Generator electrical Weak Full
Remote site, no CMS Expensive project Fast retrofit
Install Bearing probes Generator panel

Large CCGT: existing GT vibration + e-PCM on generator. Remote field GT: e-PCM as primary channel + Artesis IoT.

Oil & gas specifics

  • Costly specialist visits — trending in SCADA matters
  • Start/stop and part-load cycles — multi-band models
  • Hazardous areas — ESA in safe switchgear only
  • BOP compressors/pumps → e-MCM — compressors ESA

Architecture

GT → generator output → CTs + voltage → e-PCM → DCS / Artesis IoT

Typical cogeneration scenario

  1. GT vibration OK — planned outage in 3 months.
  2. e-PCM trends generator bearing and misalignment for 5 weeks.
  3. 36 h window — alignment and DE bearing change.
  4. Avoided process trip from lost power and steam.

e-PCM family

Asset Guide
Gas turbine this article
Steam / hydro Turbo-generators
Wind Wind farms
DGS Diesel gensets
All uses e-PCM navigator

Summary

Artesis e-PCM bridges GT and generator — especially on remote oil & gas sites and as the electrical layer on large CCGT with existing vibration CMS.

90-day e-MCM pilot · Contact

KEG TRK — official Artesis and Bently Nevada distributor in Kazakhstan.