+7 717 264 08 69
Three-Tier Artesis PdM: AMT Pro → e-MCM/e-PCM → IoT
Мақала2026 ж. 30 маусым

Three-Tier Artesis PdM: AMT Pro → e-MCM/e-PCM → IoT

Build predictive maintenance without a big-bang project: AMT Pro route on the full fleet, online on critical assets, IoT for multi-site corporate reporting.

Мақала орыс тілінде

Мақаланың толық мәтіні қазіргі уақытта орыс тілінде жарияланған. Аударма дайындалуда — толық мәтін үшін орыс нұсқасына өтіңіз.

Орыс тілінде оқу

Three-tier Artesis PdM strategy

Buying online monitoring for 200 motors at once usually fails budget approval. The KEG TRK model for Artesis is three tiers, each with measurable ROI:

Tier 1 — AMT Pro      → full fleet, low CAPEX, 7 min/asset
Tier 2 — e-MCM/e-PCM  → critical assets, 24/7
Tier 3 — Artesis IoT  → multi-site, management reporting

Tier 1: AMT Pro — light up the fleet

Tool: Artesis AMT Pro
Guide: Route diagnostics

  • One instrument, 40–50 tests/day
  • In 6 months: chronic asset list + baseline
  • Tier 2 trigger: C/D grade twice OR class-A criticality

Tier 2: e-MCM & e-PCM — critical assets

Motors → e-MCM

Artesis e-MCM — crushers, mills, main pumps, fans.
90-day pilot · Industry map

Turbo-generators → e-PCM

Artesis e-PCM — steam/gas/hydro, DGS, wind.
e-PCM navigator

AMT Pro e-MCM / e-PCM
Data Monthly/quarterly 24/7
CAPEX Shared tool Per asset
Best for Mass screening Class A, chronics

Tier 3: Artesis IoT — corporate layer

Artesis IoT when 2+ sites, 10+ online points, or management reporting needed.
Fleet centralisation

36-month roadmap

Phase Timing Action
Discovery Mo 1–2 Asset register A/B/C
Route Mo 3–8 AMT Pro, 2 cycles
Online pilot Mo 9–12 3–5 e-MCM or 1–2 e-PCM
Scale Year 2 +10–20 e-MCM
IoT Year 2–3 Multi-site dashboard

With Bently & SDT

Method Zone Product
Vibration High-speed shafts Bently
Ultrasound Bearings, steam SDT
ESA route All motors AMT Pro
ESA online Critical drives e-MCM
Generators Turbo-sets e-PCM

4 PdM methods

Common mistakes

Skip tier 1; too many pilot points; IoT before data; no programme owner.

Summary

Three tiers de-risk PdM: route first, online where it hurts, IoT for the holding company.

IoT guide · Case study: 12 months at mine/CHP · motor-monitoring catalog · Contact

KEG TRK — official Artesis distributor in Kazakhstan.